There has been some significant development over the past couple of weeks. All the electrical conduits and power points have been installed, along with some of the cabling. The water and waste pipes are in and some have been buried in concrete. As plastering requires that the place isn't an ice box, the central heating boiler is installed and working, and all the radiators except the towel rail in the bathroom are warm. The radiators will of course have to come out again for final plastering and painting of the walls behind.
 |
| Let's see... Heating out, cold water in, hot water out, heating return, condensate |
The boiler itself is a 'high-efficiency, fan-assisted, condensing' type,
which means that it should be cheap to run. Exhaust fumes are
physically blown up the chimney. There's no hot water tank; the boiler
fires up on demand and is supposed to provide instant and practically
unlimited hot water. A fresh-air intake was constructed within an
existing ventilation duct, but this is going to need some finishing work
so that it doesn't provide nesting space for the local avian wildlife.
I
queried the rather basic boiler control panel, but the full set of
controls are to be remotely attached to the wall in the living area where the
main themostat is going.
 |
| Last look at the single huge room |
I anticipate the possibility of wall-mounted TV sets, so both sides
of the plasterboard will have plywood backing to resist pull-out. I've
had previous experience of the questionable strength of 20mm plywood to
heavy objects affixed thereto. I'll keep careful record of where the
plywood is located.
Those ceiling fans arrived four days after
being ordered. These are sitting, boxed, in a different apartment until
they can be fitted at the end of the renovation. A full set of bathroom
fittings have been procured, except for a small wall-mounted sink for a
vanity unit inside the main bedroom wardrobe. This will come from IKEA
along with the wardrobes and indeed the kitchen.
The floor and
wall tiles have arrived in Budapest and I paid for them. As the flat
isn't yet ready for tiling, they're languishing in a warehouse. All the
IKEA fixtures are similarly languishing, but these haven't yet been paid
for. I'm assured no problem with any of the furniture as it's all
definitely in stock, and if there's a sudden rush for SM
ØRG
ÅS
ÞÖER
Ð reciprolating fondilators they can be obtained within a couple of working days.
And
speaking of flooring, the wood floor for the main bedroom has been
ordered. The rutted and wobbly parquet is up, and it turns out that
levelling the floor is an easy fix. The floors in the flat consist of
300mm deep steel I beams with precast concrete forming the ceiling in
the flat below. The void is filled with lightweight aggregate - slag -
and surfaced with wooden planks. All the woodwork can come up and then
be relaid at a more sensible single level.
 |
| Nasty underfloor planks need levelling |
 |
| Bathroom with plumbing |
I'm still waiting for the new entrance door and the windows; these are due for delivery on 14th December.
There remains an issue with the internal doors, in that no carpenter is interested in refurbishing the existing
olde worlde
woodwork.
 |
| I would prefer doors like this, but without the glass |
I have found some 'classic' style modern doors, and await a
price. I pointed out to the builder that the additional cost of the new
doors should be offset against the time and labour cost of refinishing
the old ones.
]}:-{>